White Paper

Medium Voltage On-site Generation Overview

It seems that just about everyone is looking for more power. As our dependency on electricity continues to grow, so does the need to design larger back-up generation systems. The transition from low voltage to medium voltage on-site generation is influenced by a mix of economic and system design considerations including: cabling distance, bus capacity, fault current capacity, switchgear cost, genset cost, and utility interconnection and integration configurations. The goal of this whitepaper is to help build a common level of understanding around components and system design considerations that readers can build upon when working with medium voltage projects.

Fill out the form below to download the complete White Paper.

note: Required Fields Are Marked With A *.
* First Name:
* Last Name:
* Company:
* Industry:
* Job Title:
* Zip Code:
* Phone Number:
* Email Address: