maintenance

Eliminate Transient Vacuums by Air Injection
Eliminate Transient Vacuums by Air Injection

Most operators know that air should be kept out of a heat exchanger’s cooling water supply line. Air can collect in pockets and block flow, increasing velocities, increasing system resistance,…



Putting a HALT to Hazardous Hopper Maintenance
Putting a HALT to Hazardous Hopper Maintenance

Those responsible for the operation or maintenance of thermal plant boilers know there is nothing trivial about hopper ash buildup. At a minimum, plugging can lead to decreased output, unscheduled…