|

Mojave Desert


Worm Gear Technology Helps CSP Plant Stay Locked on Target

Solar power generation continues to increase, with forecasts from BloombergNEF (BNEF) calling for global solar generation to make up 22% of the world’s electricity by 2050, up from about 2%…


California’s Largest Battery Storage Installation to Be Installed in Mojave Desert
Barren-Ridge-Switching-Station

The Los Angeles Department of Water and Power (LADWP) and Glendale Water and Power, through the Southern California Public Power Authority (SCPPA), on May 16, 2019, received SCPPA’s approval on…


Designing for Extremes: Battery Storage in the Mojave Desert

When Doosan GridTech installed a 25-MVA/10-MWh battery energy storage system (BESS) for the Los Angeles Department of Water and Power (LADWP) at its Beacon Solar Plant site in Kern County,…