A boiler at the Renergia waste incineration plant in Perlen, Switzerland, was experiencing fireside corrosion. The shop-applied Alloy 625 weld overlay was showing signs of premature accelerated degradation. 1. The…
A boiler at the Renergia waste incineration plant in Perlen, Switzerland, was experiencing fireside corrosion. The shop-applied Alloy 625 weld overlay was showing signs of premature accelerated degradation. 1. The…