-
News
Extended Control Valve Range
Spirax Sarco released a new control valve range, SPIRA-TROL, in 6- and 8-inch sizes and with more control options. The company says the valves are easy to maintain and do not require any special tooling due to the “clamp-in-seat” design, resulting in reduced downtime and cost of ownership. Valve size ranges have been extended due […]
-
Coal
Peabody: China, India Leading Coal "Supercycle"
While U.S. coal production has been stagnant in 2010, demand for coal in China and India has sharply risen this year and could represent the early stages of a "long-term supercycle" for the global coal industry, according to Peabody Energy, the world’s largest private coal company.
-
Geothermal
Top Plant: Blue Mountain Faulkner 1 Geothermal Power Plant, Humboldt County, Nevada
Completed in 2009 and partially funded under the American Reinvestment and Recovery Act, the 50-MW Blue Mountain Faulkner 1 Geothermal Power Plant is harnessing large amounts of renewable energy by tapping into an underground geothermal reservoir in northern Nevada. This subterranean source of heat allows the binary plant to generate pollution-free baseload electricity.
-
News
Bolt Load and Elongation Measuring Device
Boltight has developed a fast and accurate device for measuring bolt load and bolt elongation that uses the latest ultrasonic technology. Called the Boltight Echometer, the device is used for monitoring critical bolting applications either during the installation of a new plant or while carrying out routine maintenance. The Echometer works by measuring the time […]
-
O&M
Flue Gas Analysis as a Furnace Diagnostic Tool
Combustion flue gas analysis has been used to optimize the boiler air/fuel ratio for decades. Measuring the amount of excess oxygen and/or carbon monoxide in combustion flue gases gives an indication of boiler efficiency and, thereby, plant operating economics. New sensors make those measurements simple and accurate.
-
Waste to Energy
Top Plant: Colmac Energy Inc.’s Biomass- Fueled Power Plant, Mecca, California
The 47-MW Colmac Energy facility is the largest biomass-fueled power plant in California. Colmac operates with a capacity factor consistently in the 92% to 95% range and at a net plant heat rate comparable to waste coal facilities. Colmac Energy has demonstrated that biomass plants using urban wood wastes as fuel can generate significant environmental benefits, including reduced air pollutants from open-air burning and lowered demand for landfill space.
-
News
Updated Tube Expansion System
An updated HydroSwage Tube Expansion System featuring new ease-of-use and data collection features is being offered by Haskel International. The compact Mark V system provides high accuracy, speed, and repeatability by expanding heat exchanger tubes into tube sheets through the direct application of high internal hydraulic pressure. It is designed for use in fabricating heat […]
-
General
House GOP: There Will Be Blood
By Kennedy Maize Washington, D,C., November 23, 2010 — Republican blood is flowing in the halls of Congress as the GOP works to establish leadership and jurisdiction of its new House majority. The territory at stake involves energy and environment. In the House, where the gore is great, a gun fight is underway over who […]
-
News
EPA Issues GHG BACT Guidance
The Environmental Protection Agency (EPA) last week issued a long-awaited document that provides policy guidance to state agencies on how to start issuing permits to power plants and other stationary sources of greenhouse gases (GHG) when the rules take effect on Jan. 2. The document also provides technical information on how to implement the “Best Available Control Technology” (BACT) requirement for GHG sources applying to Prevention of Significant Deterioration (PSD) permits under the Clean Air Act—though it stops short of prescribing BACTs.
-
News
FirstEnergy Shelves Biomass Plans, Plans to Shutter Burger Units
FirstEnergy Corp. today announced it would permanently shut down units 4 and 5 at its R.E. Burger Plant in Shadyside, Ohio, by Dec. 31, abandoning plans to repower the coal units with biomass. The Akron-based company cited a significant plunge in market prices of electricity, saying that they “no longer support a repowered Burger Plant.”