Pilsen (5/27/2020) – Pilsen-based Doosan Škoda Power successfully installed and launched a steam turbine with an output of 200 MW (DST-S20), along with operational equipment, at the Punta del Tigre…
Pilsen (5/27/2020) – Pilsen-based Doosan Škoda Power successfully installed and launched a steam turbine with an output of 200 MW (DST-S20), along with operational equipment, at the Punta del Tigre…