gas power
-
Gas
TOP PLANT: Attaqa Power Plant, Suez City, Egypt
To alleviate chronic power shortages, the first gas turbine unit at this fast-tracked 640-MW plant was synchronized to the grid within a record-breaking 159 days—two days ahead of schedule. The revolution in
Tagged in: -
Gas
TOP PLANT: ETHYDCO Power Plant, Alexandria, Egypt
Owner/operator: APR Energy Within roughly 90 days, APR Energy set up a 60-MW turnkey power plant—complete with novel natural gas filtration and compression solutions—to support the operations of a massive Egyptian polyethylene plant until a bigger, permanent power plant can be built. It all began in April 2013, when Egyptian Ethylene and Derivatives Co. (ETHYDCO) […]
Tagged in: