|

building


DENIOS Introduces Fire Rated Non-Occupancy RFP Chemical Storage Buildings

(Louisville, KY) New Rack Fire Protect (RFP) buildings from DENIOS US are fire rated for 2-hours at 2192°F (1000°C),  minimizing the risk of fire spreading within the workplace. Designed in…


Fabric Structure Company Announces Launch of Two New Product Lines – Side Entry and Gable
gable-fabric-structure

Tara, Ontario: Calhoun Super Structure today announced the launch of two new product lines – its Side Entry (SE) line of building profiles and its Gable (GB) line of building…


Digital Control of Electricity is Real, Turning the Building Electrical Grid into a Hyper-Intelligent Smart System

It’s 2020, and the global standards for building electrical systems are still based on 70-year-old Thomas Edison era electromechanical architecture that is outdated, prone to malfunction, and lacking in basic…