Latest
-
O&M
Metallurgical Aspects of Secondary Combustion on Boiler Pressure Parts
Controlling combustion in fossil fuel power plants in order to control the emission of pollutants sometimes has adverse effects on plant equipment, including certain metals. To understand how to address the problem, it helps to understand how it develops. The emission of nitrogen oxides, generally referenced as NOx (NO or NO2), has several adverse effects […]
-
O&M
Prevent Contamination and Corrosion in Demineralized Water Storage Tanks Using Nitrogen Sparging and Blanketing
The electric power generation industry relies heavily on demineralized and deionized water during process operations. Managing the water supply is critical not only under normal operating conditions, but also during outages. When scheduled or unscheduled outages occur, many boiler and pre-boiler systems are drained. After the outage, they are refilled with water that has been […]
-
Coal
Using an Optical PM CEMS with Wet FGD for MATS Compliance
Of the three ways to comply with the Mercury and Air Toxics Standards for particulate matter (PM) measurement, using an optical PM continuous emissions monitoring system (CEMS) also delivers valuable side benefits, especially for units using wet flue gas desulfurization (FGD). Editor’s Note: This issue was published before the June 29, 2015, ruling by the […]
-
O&M
Continuous Water Washing in Wet Electrostatic Precipitators Reduces Capital Cost in the Chinese Market
As the Chinese government lowers the particulate matter (PM2.5) limits to 5 mg/Nm3 or less in coal-fired power plants, wet electrostatic precipitators are one of the key environmental components utilities select to meet this requirement. Optimization of continuous water washing of electrodes allows lower-cost alloys to be used, reducing capital expenditures. Wet electrostatic precipitators (WESPs) […]
-
Coal
Don’t Let Leachate Derail Your CCR Landfill Plans
Developing a compliance approach for a new regulation sometimes means overlooking unintended consequences of the chosen compliance method. Preparing for compliance with the new U.S. Environmental Protection Agency (EPA) regulations on coal combustion residuals (CCR Rule), published in the Federal Register on April 17, 2015, is causing many power producers to make significant changes to […]
-
Gas
The Need for Alternate PM2.5 Emission Factors for Gas-Fired Combustion Units
The Environmental Protection Agency’s emission factor resource, AP-42, is not your only option for developing particulate matter (PM) emission rates. Results of a prominent PM emissions measurement research program for gas-fired plants have been successfully used to support development and application of alternate PM2.5 emission factors by both regulatory agencies and permit applicants The regulatory […]
-
Nuclear
Riding Off into the Sunset: Nuclear Decontamination and Decommissioning Update
The International Energy Agency predicts that nearly 200 reactors will be decommissioned during the next 25 years. Industry best practices and new technology can help make the process go more smoothly. It may not come as a surprise, but the average age of operating reactors in the U.S. is greater than 35 years. There hasn’t […]
-
Renewables
The Clean and Dirty of Landfill Gas Power
Despite its apparent environmental benefits and strong government backing, generating power from landfill gas hasn’t gained traction for a variety of reasons in the U.S. Will the Clean Power Plan bolster this “dirty” renewable power source? For the U.S. Environmental Protection Agency (EPA), the only clean thing about landfills—those engineered dumps that entomb America’s infinite […]
-
Business
Public Power “Big Dog” TVA Takes Fresh Approach to Resource Planning
At the Tennessee Valley Authority (TVA), generation transitions are nothing new. The nation’s largest public power system—with 34 GW of generating capacity, supplying retail distributors with nine million
-
Coal
Xcel Energy’s Harrington Generating Station Earns Powder River Basin Coal Users’ Group Award
Harrington Generating Station, located near Amarillo, Texas, began burning Powder River Basin (PRB) coal when its units first entered service, beginning in 1976. A unique feature of the plant is that TUCO Inc. buys and delivers the coal and Savage Services owns and operates the plant’s coal-handling facility. Incomparable housekeeping and exceptional safety performance evidence […]