Irshing
-
Gas
Ansaldo Energia wins a contract for the supply of a 300 MW open-cycle plant in Irsching (Germany)
Ansaldo Energia has been awarded an EPC contract (Engineering, Procurement and Construction, on a turnkey basis) for the design, supply and installation of an open-cycle thermoelectric power plant with an installed power of 300 MW in Irsching, in southern Bavaria (Germany). The plant – called “Irsching 6” – will be equipped with an AE94.3A gas […]
Tagged in: