GAMEK
-
Hydro
Major 2-GW Hydropower Station in Angola Now Fully Online
Officials in Angola announced that the Laúca hydroelectric power station is now fully operational, with Austrian company Andritz wrapping construction of the final 70-MW environmental flow power station at the site on the Kwanza River. Andritz built and installed all the units at the 2,070-MW plant, located on the border between the Angolan provinces of […]
Tagged in: