O&M
-
O&M
Operational Considerations When Burning Higher-Chlorine Coal
An increasing supply of low-cost higher-chlorine coal is prompting many U.S. generators to give the fuel serious consideration in spite of its reputation for causing corrosion. Though corrosion can be a consideration, it’s not always caused simply by the fuel switch. Understanding the various chemical interactions, as well as operational and emissions pros and cons, […]
-
O&M
Understanding Coal Power Plant Heat Rate and Efficiency
Proposed U.S. standards for reducing carbon emissions from existing coal-fired power plants rely heavily upon generation-side efficiency improvements. Fuel, operations, and plant design all affect the overall efficiency of a plant, as well as its carbon emissions. This review of the fundamentals of coal plant efficiency, frequent problems that reduce efficiency, and some solutions for […]
-
Legal & Regulatory
How U.S. Power Generators Are Preparing for 2015
In mid-November, members of the POWER Generating Company Advisory Team responded via email to the following set of questions. Their comments have been edited for style. POWER: What changes in your fleet’s
-
O&M
Primer on Fuel Quality Analysis
Back in the “good old days” of the power industry, fuel was cheap, fuel supplies were fairly constant, air emissions regulations were loose, and power plant coffee was as dark as sin and worse for you
-
O&M
Global Water Outlook for Power Generation
Water and energy are intimately linked. Water is necessary for the production, distribution, and use of energy. Energy is needed for the withdrawal and delivery of water. The two are inseparable. Several
-
O&M
Inspecting Aberrant P91 Components for Integrity
Many utilities around the world have been discovering abnormal or aberrant P91 base and weld metal microstructures in their plants, leading to, or with a potential to lead to, early cracking and failure in
Tagged in: -
O&M
Wind Turbine Generator Maintenance: What to Expect and Why
Over the past few years, wind generation projects have become prominent features of the North American landscape and of the utility infrastructure. In spite of their variable production load onto the grid
-
O&M
Coal-Fired Power Plant Heat Rate Improvement Options, Part 2
In recent years several EPRI projects have explored different aspects of heat rate improvements. This article, following Part 1 in the November 2014 issue of POWER , reviews results of implementing heat rate
-
O&M
Assessing and Prioritizing Structural Repairs to Material-Handling Systems
Material-handling systems at coal-fired power plants operate nearly continuously in harsh conditions for decades. Temperatures, moisture, overload conditions, and collisions from equipment can take a toll on
Tagged in: -
O&M
Point Level Capacitance Switch for Fly Ash Hopper Measurement
If you’re the person tasked with controlling the level of fly ash in collection hoppers, you know how difficult the application can be. What at first looks like a simple measurement quickly proves to be much more demanding in actual execution. The first problem is the environment inside the collection hoppers, which is extremely challenging […]