News

  • Progressing Cavity Pump with Unique Gear Joint

    Moyno Inc. launched its Moyno 2000 Progressing Cavity Pump with a unique gear joint that allows the versatile pump to handle a wide range of applications, from shear-sensitive chemicals to difficult-to-process slurries and sludges. The crowned gear universal joint drive train configuration provides exceptional torque and thrust control, and the patented joint seals effectively protect […]

  • My Top 10 Predictions for 2011

    It’s time to pull my crystal ball out of storage, polish it up, and give you another round of U.S. industry predictions for 2011. I graded last year’s predictions B+ (for a complete rundown of how I graded each prediction, see page 32), but I’m convinced I’ll do better in 2011.

  • EPA to Set "Modest Pace" for GHG Standards

    The U.S. Environmental Protection Agency has issued its plan for establishing greenhouse gas (GHG) pollution standards under the Clean Air Act in 2011. The agency looked at a number of sectors and is moving forward on GHG standards for fossil fuel power plants and petroleum refineries—two of the largest industrial sources, representing nearly 40% of the GHG pollution in the U.S.

  • GE Agrees to Complete Cleanup of Hudson River PCB-Contaminated Sediment

    The General Electric Co. (GE) agreed last week to requirements established by the U.S. Environmental Protection Agency (EPA) for final cleanup of PCB-contaminated sediment in the Hudson River. The second phase of the cleanup is to begin in late spring.

  • $17M DOE Loan Guarantee for NY Energy Storage

    U.S. Energy Secretary Steven Chu announced on Dec. 23 that a $17.1 million loan guarantee has been finalized for the AES Westover facility. The loan guarantee will support the construction of a 20- MW energy storage system using advanced lithium-ion batteries.

  • DOE Announces up to $74 Million for Fuel Cell Research and Development

    The U.S. Department of Energy (DOE) announced last Wednesday that it is accepting applications for a total of up to $74 million to support the research and development (R&D) of clean, reliable fuel cells for stationary and transportation applications.

  • Challenges to Data Used in EPA’s Coal Ash Regulation Cost-Benefit Analysis

    In a news conference hosted today by the Environmental Integrity Project (EIP), presenters argued that the Environmental Protection Agency (EPA) has overstated the economic benefits of recycling coal ash by more than 20 times and exaggerated the potential stigma on recycled fly ash that could result from tougher coal ash regulations. At the same time, the EPA is vastly underemphasizing the costs to human and environmental health of not regulating the substance, presenters said.

  • DOE Finalizes Loan Guarantee to Support World’s Largest Wind Project

    Last Thursday, U.S. Energy Secretary Steven Chu announced that a partial loan guarantee for a $1.3 billion loan has been finalized to support the world’s largest wind farm. The loan will finance the Caithness Shepherds Flat project, an 845-MW wind generation facility located in eastern Oregon sponsored by Caithness Energy LLC and GE Energy Financial Services.

  • Kansas Approves Air Permit for Sunflower’s Coal-Fired Power Plant

    Sunflower Electric Power Corp. on Dec. 16 was notified that the Prevention of Significant Deterioration air quality construction permit for its 895-MW Holcomb expansion project was approved by Acting Secretary of the Kansas Department of Health and Environment (KDHE) John Mitchell. The permit is expected to be issued by the end of the year. The […]

  • Basin Electric CO2 Capture Project on Indefinite Hold

    Basin Electric’s directors decided last week that a proposed demonstration project to capture emissions of carbon dioxide (CO2) at the Antelope Valley Station (AVS) in Beulah, N.D., will remain on hold until the economic viability of such a venture can be further developed.