Brian Berry
Articles By

Brian Berry

  • Why Utilities Can’t Afford to Wait to Deploy DLR

    Transmission congestion currently affects approximately 70% of the U.S. grid. Bottlenecks delay the interconnection of cost-effective clean energy sources, limit the transfer of electricity between regions, and raise operational and consumer costs. Dynamic line rating (DLR) technology mitigates these challenges with valuable newfound transmission capacity. DLR allows operators to utilize the maximum capacity of existing […]